Construction Contract Review: 3 Things to Check Before Signing

Picture a kitchen table. There’s a document sitting on it — maybe twelve pages, maybe thirty. A pen rests beside it.

You’ve earned your way to this table. You spent months in the design phase, collected proposals, compared bids. Over the last few weeks, you walked the two paths together — cost-plus on one side, fixed-price on the other — and you chose the contractor who fits your project.

Now there’s just this one piece of paper between you and the start of construction.

Here’s what I see go wrong after 35+ years of doing this: the homeowner treats this moment like a formality. The hard part feels finished. The decisions feel made. So they skim, they nod, they sign.

That piece of paper is the single most important document in your entire project. It’s the one thing that protects you when — not if — something gets remembered differently six months from now.

Today I’m walking you through a proper construction contract review. Three things: who you’re actually signing with, what has to be inside the document, and whether the company name and license number on the page are even real.

I’m not a lawyer, but I’ve sat at a lot of these kitchen tables. Let’s slow this moment down.

construction-contract-review

Who Are You Actually Signing With?

Before we get into what’s inside the contract, answer a simple question that a surprising number of homeowners get fuzzy on: Who exactly are you signing this with?

The answer shapes who is on the hook for what — and it surprises people more than it should.

Clearing Up the Language

Throughout this series, you’ve heard me say general contractor, GC, contractor, builder. Those are all the same person. That’s the primary entity responsible for building your project.

Here’s the part a lot of people miss: you contract with one entity — the general contractor. That’s it.

The GC then hires subcontractors — the framers, plumbers, electricians, tile setters. But you don’t contract with any of those subs. Your agreement is with the general contractor. The subs’ agreements are with the GC independently.

When you’re sitting at the table, you should be signing with one company. That company carries the responsibility for everybody they bring onto your job. One throat to choke, as the old saying goes.

The Mechanics Lien Wrinkle

Here’s something that catches good, honest homeowners completely off guard — one of those you don’t know what you don’t know things I keep coming back to.

You don’t contract with subs, but the subs and suppliers can still come after you and your house if they don’t get paid. Even if you paid your general contractor in full.

It’s called a mechanics lien. Anybody who improves your property and doesn’t get paid can file a claim against your home.

Picture this: You pay your GC every dollar on time. Your GC, for whatever reason, doesn’t pay the framer. The framer can put a lien on your house. Now you’re potentially paying twice for the same work.

I’m not telling you this to scare you. I’m telling you because there’s a simple protection — and we’ll get to it when we talk about payments. For now, just file that away: not contracting with the subs doesn’t mean the subs can’t reach you.

Three Ways to Structure Your Team

So who can sit across that table from you? There are really three setups:

1. You hire a general contractor — one entity. Most common, simplest accountability.

2. You act as your own general contractor — if, and this is a big if, you genuinely have the experience. When you do this, you become the one coordinating every trade, every schedule, every inspection. You carry the risk that a real GC normally carries for you. Some folks have the chops. Most don’t, and they find out the expensive way.

3. You hire a design-build company — one umbrella handles both design and construction. One point of contact, design and build accountable to each other.

Which of these is right for you? That’s a whole conversation coming in a future series on building your team. But tonight I just want you to know which chair you’re sitting in before you pick up that pen.

Bottom line: One contract, one entity, usually your general contractor. The subs answer to them, not to you. But they can still reach your house if they don’t get paid.

What Has to Be Inside the Construction Contract

Now that we know who’s signing, let’s talk about what they’re signing.

Rule number one is going to sound almost too obvious to say out loud.

Rule number one: Have a contract.

I know how that sounds, but the number of major projects that start on a handshake and a verbal “we’ll figure it out” is staggering — and it’s where the trouble begins.

Why Documentation Exists

Think about everything that happens before you ever get to that table. Months of design. Dozens of meetings. Hundreds — and I mean hundreds — of emails and conversations and text messages about what’s included, what the finishes are, what’s in and what’s out.

Now ask yourself: six months from now, in the middle of construction, who remembers all of that accurately?

Nobody.

Here’s the uncomfortable truth: homeowners are just as guilty of misremembering as contractors and designers are. Everybody remembers the version that favors them. It’s human nature.

That is exactly why documentation exists. A real contract is the antidote to convenient memory. When there’s no contract, every disagreement becomes your word against theirs, and your project gets undermined before the first wall goes up.

Point at Your Actual Project

A contract is more than boilerplate legal language. A real contract should point directly at your project. It should reference your specific plans and your specific scope of work. Not generic “contractor will build a house” — your house, your plans, your spec list.

Here’s a tool I want you to know about: best-run projects also have what I call a supplemental scope of work document. That’s a single document that gathers up all that back and forth — all those emails and decisions and “we agreed on this” moments — and puts them in one central place that the contract can point to.

When everything lives in one spot, there’s nothing to misremember.

In some of my previous episodes, I got into the details way back in the design phase of the project. You’re not only creating designs and plans, but you’re also creating specifications for your materials and equipment. You’re also drafting a scope of work document — more of a narrative explaining to the builder exactly what you want done, where, how, why.

This is often organized by construction categories. It streams all the way through to the project schedule, to the cost breakdowns, even to the payment schedule that we’re going to talk about next.

These are important elements and components that should be included in and referenced within your construction contract.

The Law Agrees With Me

Let me give you some reassurance here, because this isn’t just my opinion. The law is often on your side. Rules vary state to state, so check your own. But to give you a flavor: in California, any home improvement project over $500 legally requires a written contract.

It has to be labeled. It has to carry the contractor’s license number. And it has to give you a three-day right to cancel after you sign.

Read that back. The state itself decided this matters so much that it made a written contract the law.

When a contractor tells you “we don’t really need all that paperwork,” that’s not a shortcut. That’s a red flag. A professional who builds homes for a living and resists putting it in writing is telling you something about how the rest of the project’s probably gonna go.

Rule one: Have a contract. Make it point at your actual plans and specs. Back it up with a scope of work document that captures every decision in one place. Get it in writing.

Ask for the Standard Contract Early

Here’s a move that almost nobody makes — and it’s one of the smartest things you can do before you’re ever handed something to sign.

As you’re narrowing down your final contractor candidates — before you’ve chosen, before there’s any pressure — ask each of them for a copy of their standard contract.

Not a completed contract filled out with your project. Just their standard template.

Why Ask for This?

Two big reasons.

First, it gives you time. Time to read it calmly at your own kitchen table with nobody waiting on you to sign. You’d be amazed how different a contract reads when there’s no pen in your hand and no one across the table.

Second, it gives you a baseline. When the real contract finally lands in front of you — the one with your name and your project on it — you can lay it next to the standard one you read weeks ago. If anything’s different, you get to ask why. Maybe it’s a perfectly good reason. Maybe it’s not. But now you’ll know instead of signing blind.

The Free Background Check

There’s a bonus benefit, almost a free background check. How a contractor responds to “can I see your standard contract” tells you who you’re dealing with.

Did they get it to you quickly? Or did you have to chase them for three weeks? Is it a real, complete, professional document? Or is it one and a half pages?

The good professionals in the industry use real contracts. The architects’ associations and the home builders’ associations both publish them. I’m not saying your contractor has to use one of those. I’m saying the quality and completeness of the document you get back is a window into how they run their business.

Sloppy contract, sloppy project. It correlates more often than not.

The Principle

The contract they hand you to sign should be the contract you already read. No surprises at the table.

If the document that shows up for your signature is the first time you’re seeing it, you’ve lost your leverage and your review time both.

Move that work to the front while you still have all the power — which, by the way, is before you’ve signed anything.

Ask for the standard contract early. It buys you calm review time. It gives you a baseline to catch changes. And the response itself screens your contractor for you.

The Payment Section: Read It Twice

Now let’s open that document up and turn to the one section you read twice — because this is where your money either lives or dies.

Every contract has a section on payments. Of all the pages in the document, this is the one I want you to read slowly, then read again. How the money flows is the difference between a project you control and a project that controls you.

The Healthy Structure

The healthy structure is a schedule of progress payments tied to milestones. You pay a defined amount when a defined chunk of work is actually complete.

  • Foundation’s in and inspected → payment.
  • Framing’s up and inspected → payment.

The money follows the work.

The Warning Sign

The opposite of that: if a contractor wants all of their money up front — or a giant chunk of it before they’ve turned a shovel — yikes. That is one of the loudest warning signs in the entire business.

The moment your money is ahead of the work, all your leverage is gone. You are now hoping. And hope is not a contract.

Know Your State’s Legal Limits

Let me make this concrete. Rules vary by state. Check yours. But California sets a hard limit on the down payment: it cannot be more than $1,000 or 10% of the contract price, whichever is less.

Sit with that for a second.

On a $50,000 remodel, 10% would be $5,000. But the rule says lesser of the two. So the legal maximum down payment is one thousand dollars. Not five.

If somebody’s asking for fifteen, twenty, or thirty percent down to order materials, you now know that in a state like California, that’s not just aggressive. It’s against the law.

And it keeps going. Every payment after that down payment can’t exceed the value of the work that’s actually been completed. You pay for work done, never for work promised.

Burn that into the steering wheel, because the payment schedule is your steering wheel for this whole project.

The Material Ordering Wrinkle

Now, being a contractor in California, I know this causes problems. In effect, you’re asking the general contractor to finance your project by outlaying — in some cases — a substantial amount of cash to order materials.

There are ways to handle this within a project, and that could be a completely separate episode. The highlight is there are certain times contractors must order materials way ahead of time — windows, cabinetry, those kinds of things.

So there are ways to work around this. It’s important that you consult with either a construction law attorney or perhaps your architect or owner agent on how to facilitate this.

For example, there’s going to be a project schedule. Let’s assume we’re building a high-end custom home — a multimillion-dollar project. Two hundred thousand dollars’ worth of windows have to be ordered.

I don’t think it’s quite fair to ask the contractor to shell out all that money ahead of time. So there are certain draw requests that can be incorporated into the project after construction has begun or deployed with the construction crews.

That’s where it gets a little precarious — sometimes you may have to order materials before you even start construction. This has to get into a much more detailed conversation with the people that matter.

How I do it: I tie all of those payments to the progress schedule after we’ve deployed on the project, so it’s fair to the homeowner that we’re actually on-site working, building, creating — and that there are certain elements that have to be ordered ahead of time.

There’s not a lot of elements that have to be ordered ahead of the project start date. Sometimes there are, but often there’s not. That has to be really factored and considered in.

The Lien Release Discipline

I told you back at the start I’d close the loop on the mechanics lien thing. Here it is.

Remember: an unpaid sub or supplier can lien your house even if you’ve paid your general contractor. So how do you protect yourself?

Two things.

One, in a lot of states, your contract will include a notice to you — sometimes literally called a Notice to Owner — that warns you about liens and how to prevent them. Read that. Don’t skip it because it looks like fine print.

Two, with each progress payment, you ask for a lien release (sometimes called a lien waiver) from the general contractor and from the major subs and suppliers tied to that payment. It’s a simple signed document that says, “We got paid for this work, and we waive our right to lien you for it.”

Money goes out, signed release comes back. That’s the discipline. Do that, and the double-payment nightmare we talked about simply can’t happen to you.

Payment Section Summary

  • Insist on progress payments tied to real milestones.
  • Keep that down payment tiny and know your state’s legal cap.
  • Never let your money get ahead of the work.
  • Collect a lien release with every check you write.

That’s how you stay in the driver’s seat.

Verify the License Number Yourself

There’s one last thing to check before you sign — and honestly, it’s the one most homeowners never think to do.

Whose name is actually on the contract?

You’ve read the whole document. The scope is right. The payments are right. You’re ready to sign.

Stop for 60 seconds and do one more thing.

Confirm that the company name and the license number printed on this contract actually match the people you’ve been dealing with this whole time.

Because I’m afraid to say, they don’t always.

The License Scam

Here’s a scam that’s been around as long as licenses have existed, and it still catches people.

Sometimes an individual who can’t get work legitimately will partner with somebody who holds a license — because their own license either doesn’t exist or it’s been suspended or revoked.

So the name on the truck, the person you’ve been talking to, the bid you liked — none of it actually matches the license number on the paper.

This isn’t theoretical. Right here in Northern California, state investigators ran an undercover sting and arrested a dozen people for unlicensed contracting. One of them was caught using a license number that had already been revoked.

These are people willing to put a fake or borrowed number on a contract and hand it to a homeowner who’s too polite to check.

The Free Three-Minute Move

Here’s the move. It’s free, and it takes about three minutes.

Look the license up for yourself.

Every state that licenses contractors has an online lookup tool. In California, it’s the Contractor State License Board — CSLB.ca.gov. You can search by name, by business, or by license number.

You’ll see the status — whether it’s active, what classification it’s for, the bond, the workers’ comp, and whether there’s any disciplinary history.

When you pull it up, you’re checking three things:

  1. Is it active and in good standing?
  2. Does the classification actually match the work you’re hiring for?
  3. Does the name on the license match the company on your contract?

A Line to Remember

Let me give you a line I want you to remember:

A contractor saying “we’re licensed” is a sales statement. A license number you looked up yourself is a fact.

Those are not the same thing. Don’t take the claim. Get the fact.

Two More Quick Things at the Signing

First, the people who run these license boards will tell you: ask to see the contractor’s pocket license card and compare it against a photo ID. Make sure the human being in front of you is actually the license holder — or somebody clearly authorized to sign for that company.

Second, look at the signature line itself. Remember, this is a mutual contract. You’re on the hook, and so are they. Be sure the person signing is genuinely qualified to bind that company.

A signature from somebody with no authority is a signature that can evaporate when you need it most.

Before the Pen Touches Paper

Company and license match. You verified the number yourself. The classification fits. And the person signing actually has the authority to.

Sixty seconds of checking against a problem that could cost your entire project. That’s a trade I’ll take every single time.

Frequently Asked Questions

What is a construction contract review?

A construction contract review is the process of carefully examining the legal agreement between you and your contractor before signing. It involves verifying who you’re contracting with, confirming all project specifics are included, checking payment terms against state law, and validating that the contractor’s license is active and legitimate. Bill Reid, residential construction expert with 35+ years of experience, recommends homeowners perform this review at least twice — once when you receive the standard contract template early in the selection process, and again when the final contract arrives with your project details filled in.

How do I verify a contractor’s license before signing a construction contract?

Visit your state’s contractor licensing board website (in California, it’s CSLB.ca.gov) and search by the license number printed on your contract. Verify three things: the license is active and in good standing, the classification matches the work you’re hiring for (general contractor, electrical, plumbing, etc.), and the name on the license matches the company on your contract. Also ask to see the contractor’s pocket license card and compare it against a photo ID to confirm the person in front of you is the actual license holder.

What should be included in a home renovation construction contract?

A proper construction contract must reference your specific plans, specifications, and scope of work — not generic boilerplate. It should include a payment schedule tied to completion milestones, the contractor’s license number, start and completion dates, a detailed scope of work or reference to a supplemental scope document, lien waiver requirements, change order procedures, and warranty terms. In California, any project over $500 legally requires a written contract that includes the contractor’s license number and a three-day right to cancel.

What is a mechanics lien and how does it affect homeowners?

A mechanics lien is a legal claim that subcontractors or suppliers can file against your property if they aren’t paid for work or materials — even if you paid your general contractor in full. To protect yourself, collect a lien release (also called a lien waiver) from your general contractor and major subcontractors with every progress payment you make. This signed document confirms they’ve been paid and waives their right to lien your property for that work. The discipline is simple: money goes out, signed release comes back.

What are legal limits on construction down payments?

Legal limits vary by state. In California, the down payment cannot exceed $1,000 or 10% of the total contract price, whichever is less. For example, on a $50,000 remodel, the maximum legal down payment is $1,000 — not the $5,000 that 10% would suggest. Every payment after the down payment cannot exceed the value of work actually completed. If a contractor asks for 20-30% down before breaking ground, that’s not just aggressive — in California, it’s against the law.

When should I ask to see a contractor’s standard contract?

Ask for the standard contract template while you’re still evaluating contractor candidates — before you’ve chosen anyone and before there’s pressure to sign. This gives you time to read it calmly without a pen in your hand, establishes a baseline so you can spot changes when the final version arrives, and serves as a free background check on how the contractor runs their business. How quickly they provide it and how complete the document is tells you a lot about their professionalism.

Want to go deeper? Get the book at https://www.amazon.com/dp/B0F1MDRPK7 — or grab the free Tale of Two Homeowners download at https://the-awakened-homeowner.kit.com/09608e1727. When you’re ready to plan your project, BuildQuest walks you through the Discovery Framework step by step at https://buildquest.co.